
Plumbing Fees Schedule
Permits for Complete Disposal System & Variance
Disposal System Design | Minimum Fee | State Portion (25%) of Minimum Fee |
Complete Engineered System | $200.00 | $50.00 |
Complete Non-Engineered System | $250.00 | $62.50 |
Primitive System (includes one alternative toilet) | $100.00 | $25.00 |
Separate Grey Waste Disposal Field | $35.00 | $8.75 |
Seasonal Conversion Permit | $50.00 | $12.50 |
First Time System Variance | $20.00 | $5.00 |
Permits for Separate Parts of Disposal System
Component | Minimum Fee | State Portion (25%) of Minimum Fee |
Alternative Toilet (only) | $50.00 | $12.50 |
Disposal Field Only (engineered system) | $150.00 | $37.50 |
Disposal Field Only (non-engineered system) | $150.00 | $37.50 |
Septic Tank Only (non-engineered) | $150.00 | $37.50 |
Septic Tank Only (engineered) | $80.00 | $20.00 |
Holding Tank | $100.00 | $25.00 |
Advance Treatment Unit - Tank | $150.00 | $37.50 |
Advance Treatment Unit - Component | $30.00 | $7.50 |
Other Components (complete pump station, piping, other) | $30.00 | $7.50 |